top of page

Our services
Annual and 5 yearly inspection / re-certification of
​​
-
Offshore / subsea cranes
-
Deck cranes / other lifting equipment
-
ROV / LARS systems
-
Lifeboat / Davit / On-load release gear
-
FRC-MOB / Davit
-
Loose lifting gear / harness
-
Assist client on FAT-HAT-SAT on crane projects
-
3rd party survey after accidents
New certification
Re-certification of lifting devices is required, among other things, in the following cases:
-
First-time installation
-
Substantial change to installed device
-
Substantial damage to load-bearing structure
-
Re-certification must be carried out with a load test after 5 years.
We have load test equipment to carry out full inspections.

bottom of page
